heater_fabrication
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
heater_fabrication [2020/02/25 12:10] – gerry | heater_fabrication [2020/02/25 12:58] (current) – gerry | ||
---|---|---|---|
Line 8: | Line 8: | ||
{{ : | {{ : | ||
- | ==== Resistor Location ==== | + | ===== Resistor Location |
The leads of the heater resistor should not protrude far beyond the edge | The leads of the heater resistor should not protrude far beyond the edge | ||
Line 38: | Line 38: | ||
{{ : | {{ : | ||
- | Remove | + | |
+ | After drilling | ||
{{ : | {{ : | ||
- | {{ : | + | Change the position of the spreader in the vise, and use a file to remove the burr. |
- | {{ : | + | Make sure the surface of the spreader protrudes above the vise jaws. You don't want to dull the file or scratch the vise by filing the vise instead of the burr. |
+ | {{ : | ||
+ | Here is a photo of a heat spreader with the burr removed. | ||
+ | {{ : | ||
+ | ===== Attach the resistor to the heat spreader ===== | ||
+ | Secure the resistor to the heat spreader with the small screw. | ||
+ | {{ :heater: heater_screw_attach_resistor_to_spreader.jpg |}} | ||
- | Attach | + | The screw will protrude from the back side of the spreader. |
+ | {{ :heater: heater_screw_spreader_protruding.jpg |}} | ||
+ | ===== Solder the extension wire to the resistor ===== | ||
+ | Move the heater assembly to a solder station and solder the lead wires to the resistor. | ||
- | File the point of the screw | + | {{ :heater: heater_wiring_solder_resistor.jpg |}} |
+ | Add heat shrink to the exposed resistor leads. | ||
+ | {{ :heater: heater_wiring_solder_resistor_heatshrink.jpg |}} | ||
+ | Before proceeding with the assembly, use a multimeter to verify continuity of the heater assembly. | ||
+ | {{ :heater: heater_multimeter_verify_resistance.jpg |}} | ||
- | Solder | + | ===== Seal the heater assembly ===== |
- | + | **STOP HERE:** Ask the instructor about adding the sealant to the | |
- | + | ||
- | + | ||
- | + | ||
- | Add heat shrink to the resistor leads | + | |
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | Verify the heater resistance before sealing the heater | + | |
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | Locate the heat spreader in the middle of the large shrink tubing | + | |
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | STOP HERE: Ask the instructor about adding the sealant to the | + | |
wires before the heating the heat shrink. | wires before the heating the heat shrink. | ||
+ | Locate the heat spreader in the middle of the large shrink tubing. | ||
+ | {{ :heater: heater_heatshrink_beside.jpg |}} | ||
+ | Consult with the instructor about adding sealant to the end of the heat shrink that has the wire leads protruding. | ||
+ | {{ :heater: heater_heatshrink_inside.jpg |}} | ||
- | Use a heat gun to secure | + | After adding sealant to the wire ends, work quickly (no rush, just don't dally) to use a heat gun to shrink the tubing on the end with the protruding |
- | + | ||
- | + | ||
- | Do not heat the heat shrink tubing until the instructor | + | |
- | adds sealant | + | |
+ | The important feature is that there are no openings for water to enter inside the heat shrink along the wires. | ||
+ | {{ :heater: heater_heatshrink_closed_end.jpg |}} | ||
+ | When the wire-end of the heat shrink tubing is finished, apply heat to the open end. While the open end is still warm, place the tubing in a vise and crush the tubing gently. | ||
+ | {{ :heater: heater_heatshrink_closed_end_crushed.jpg |}} | ||
- | | ||
- | Heat the free end and crush it in a vise to seal it | ||
+ | Use a multimeter again to test the continuity of the heater assembly. | ||
heater_fabrication.1582661421.txt.gz · Last modified: 2020/02/25 12:10 by gerry